折腾啥

  1. Nimclip: 原生本地优先的 macOS 剪贴板历史管理工具

    Nimclip: 原生本地优先的 macOS 剪贴板历史管理工具

    很轻很快
    支持 Telegram 大会员表情等数据
    暂不支持 OCR 已支持 OCR

    • 常驻菜单栏运行,支持文字、链接、代码、图片历史记录,通过 ⌘ ⇧ V 快速搜索并粘贴历史内容,提升日常复制粘贴效率

    • 提供标签、收藏、类型筛选、来源应用识别、富文本保留、纯文本粘贴、多条内容合并等功能,覆盖开发与办公常用场景

    • 数据基于 SwiftData 与 SQLite 保存在本地,支持中英文界面、深浅色主题、快捷键、自定义保留策略,兼顾隐私与使用体验

    https://github.com/hukdoesn/Nimclip

    合集 群组 恰饭 联系推广

    #macOS #剪贴板 #效率工具 #开源项目 #Swift #SwiftUI #GitHub #本地优先

  2. cj2api: 将 ChatJimmy 转换为 OpenAI 兼容 API 的轻量代理

    cj2api: 将 ChatJimmy 转换为 OpenAI 兼容 API 的轻量代理

    就感觉到快 好不好不知道 你就说快不快吧

    • 提供标准 OpenAI Chat Completions 接口,支持 SSE 流式输出、非流式响应与 OpenAI SDK 直接接入

    • 支持 Cloudflare Workers 与腾讯云 EdgeOne Pages 一键部署,自带在线测试页面和多语言调用示例

    • 内置 Token 统计、usage 返回与纯 TypeScript 实现,无第三方运行时依赖,适合快速搭建 AI API 服务

    https://github.com/qingchencloud/cj2api

    合集 群组 恰饭 联系推广

    #开源项目 #AI #OpenAI #API #Cloudflare #EdgeOne #TypeScript #GitHub

  3. Sub-Store 更新

    Sub-Store 更新

    ⚙️ 后端: 2.36.7

    🌐 前端: 2.28.9

    ▎未显式关闭 UDP 的情况下, 视为开启 UDP

    通常这应该不会有啥问题

    主要是有些 App 不需要显式开启 UDP, 但是 mihomo 又需要显式开启 UDP

    ▎修改链接

    承接频道/群广告
    有需要的老板可以私聊联系


    Sub-Store 合集 合集 恰饭推荐 群组 联系推广

    #SubStore #更新记录 #changlog #updates

    • ❤️2
  4. 万一中了呢

    万一中了呢 https://fixupx.com/thsottiaux/status/2077248807533003257

    • ❤️1
  5. MacTools: 免费开源的 macOS 原生菜单栏工具集合

    MacTools: 免费开源的 macOS 原生菜单栏工具集合

    • 聚合显示器控制、系统优化、磁盘清理、网络检测、翻译、启动台等数十项常用功能,统一集成到原生菜单栏,保持轻量高效

    • 基于 SwiftUI + AppKit 构建,支持插件扩展、全局快捷键、自定义菜单栏图标,兼顾原生体验与可扩展性

    • 提供风扇控制、电池充电上限、系统状态监控、活动统计等高级能力,覆盖日常办公与开发场景

    https://github.com/ggbond268/MacTools

    合集 群组 恰饭 联系推广

    #macOS #开源工具 #菜单栏工具 #SwiftUI #AppKit #GitHub

    • 🥰3
    • ❤️1
    • 🎉1
  6. EdgeEver: 基于 Cloudflare 的开源 AI Agent 原生自托管笔记工作区

    EdgeEver: 基于 Cloudflare 的开源 AI Agent 原生自托管笔记工作区

    • 基于 Cloudflare Serverless 架构,个人使用运行在免费额度内,支持一键部署,长期保持 0 运维体验

    • 原生集成 REST API、OpenAPI 与 MCP Endpoint,支持 Claude Code、Codex 等 AI Agent 直接读取、整理和管理笔记

    • 保留经典三栏笔记体验,支持无限层级笔记本、离线编辑、历史版本、多端同步与开放数据存储,方便长期沉淀个人知识库

    https://github.com/tianma-if/edgeever

    合集 群组 恰饭 联系推广

    #开源项目 #知识管理 #自托管 #Cloudflare #AI #Agent #MCP #GitHub

    • ❤️6
    • 🖕1
  7. I've been grinding away at the MikuBox core lately, and honestly? Sing-box is such a pain in the ass. The versioning is way too aggressive—1.10 to 1.12 to 1.13 to 1.14, just constantly deprecating fields. Every time I bump the core, I’m hit with a mountain of breaking changes; it’s like fixing one bug just to uncover three more.

    Forwarded from MikuDayo (Neko Beillc)
    I've been grinding away at the MikuBox core lately, and honestly? Sing-box is such a pain in the ass. The versioning is way too aggressive—1.10 to 1.12 to 1.13 to 1.14, just constantly deprecating fields. Every time I bump the core, I’m hit with a mountain of breaking changes; it’s like fixing one bug just to uncover three more.

    It got me thinking, though: since I’m already deep into refactoring the backend, why not just jump ship to Mihomo (formerly Clash.Meta, the Clash lineage)? The Mihomo ecosystem is massive—proxy subscriptions, rule-providers, all the various GUIs and dashboards—most of them are built around the Clash spec. It’s got an overwhelming edge in terms of maturity and user base.

    So, the plan is to drop support for sing-box. I’m going to keep the current framework but rewrite the whole thing from scratch for Mihomo. It’s going to be a hell of a lot of work, but I’m aiming for a much better user experience. Stay tuned!

    • 👍15
  8. PicTrim: 基于 Rust 与 libvips 的高性能图片批处理工具

    PicTrim: 基于 Rust 与 libvips 的高性能图片批处理工具

    • 支持批量缩放、压缩、旋转、格式转换,可混合导入图片和目录,支持拖拽操作,适合高效处理海量图片

    • 基于 Rust + libvips 构建,采用流式任务队列与多线程并发处理,兼顾高性能、低内存占用,轻松处理千万级图片

    • 提供丰富批处理选项,支持保留目录结构、跳过已有文件、实时查看处理进度与统计信息,适合重复执行和增量处理

    https://github.com/NemoAlex/PicTrim

    合集 群组 恰饭 联系推广

    #图片处理 #批处理 #Rust #libvips #开源工具 #GitHub #Windows #macOS

  9. t.me 被 serverhold 了

    风向旗参考快讯
    Telegram的t[.]me域名被注册局暂停

    即时通讯软件 Telegram 的 t[.]me 域名已宕机,WHOIS现显示“serverHold”状态,这是一种注册局级别的暂停,会完全阻止该域名解析。

    所有 t[.]me 链接当前均无法访问。该通讯应用本身仍可运行,但链接分享功能彻底完蛋了,直到这个限制被解除。
    t.me 被 serverhold 了

  10. WhisperJAV: 日本成人视频 AI 字幕生成器

    WhisperJAV: 日本成人视频 AI 字幕生成器

    转需

    利用 OpenAI Whisper 及其他语音识别模型从视频和音频文件中生成精准的日语字幕,并针对日语语言处理进行了专门优化

    https://github.com/meizhong986/WhisperJAV

    合集 群组 恰饭 联系推广

    #字幕 #语音识别 #日语 #ASR #Whisper #Qwen3 #AI #翻译 #GitHub GitHub - meizhong986/WhisperJAV: ASR/STT subtitle generator. Uses Qwen3-ASR, local LLM, Whisper, TEN-VAD. Noise-robust for JAV

    • ❤️5
  11. Files.md: 面向 Markdown 的本地优先知识管理工具

    Files.md: 面向 Markdown 的本地优先知识管理工具

    • 基于纯 .md 文件构建个人知识库,支持笔记、日记、任务、项目等内容,数据完全由用户掌控,天然兼容 AI 工作流

    • 浏览器即可运行,支持 PWA 离线使用、可选自托管同步、云盘同步及 Telegram Bot,兼顾隐私与多设备协作

    • 极简架构设计,无需 Electron 和复杂构建流程,代码易于理解与扩展,适合开发者基于 LLM 深度定制自己的知识管理系统

    https://github.com/zakirullin/files.md

    合集 群组 恰饭 联系推广

    #知识管理 #Markdown #本地优先 #开源项目 #GitHub #PWA #Telegram #Go #AI

    • ❤️3
    • 👏3